Control Lightingadopts a structured and disciplined approach to every project they undertake. Control Lighting's Project Director Ray Dolby, and his team, conduct a detailed assessment with the client to ascertain the essential requirements of the project. Once the initial consultative stage has been concluded, an outline proposal document is produced detailing specific equipment types, with corresponding performance specifications. This document will also include a schematic layout of the system and a budget summary.