Offering full national coverage, consistently high standards and exemplary on-site conduct, combined with meticulous planning and safety compliance, Power Contractors have a reputation for professionalism and experience. We provide seamless cable installation services, civil engineering, substation construction and utility infrastructure services, across a wide range of sectors. Our LV and HV cable installation service operates nationwide, 24 hours a day, 7 days a week, carrying out cable installation projects from 1kV to 132kV, ranging from small commercial projects to larger infrastructure schemes for the utilities such as the National Grid and Integrated Utility Services (Northern Power Grid).

We offer our clients a single source solution, managed on site to our exacting standards, undertaking substation construction and civil engineering works including excavation, reinstatement and associated civil engineering works in any surface - grass, paving, flags, tarmac and concrete. Moulded Fibre Products, Scunthorpe -Modification of existing HV substation including concrete base for HV Ring Main Unit, excavation of trenches and installation of HV cables. Acorn Web, Normanton -Construction of brick-built transformer compound, excavation of trenches for both HV and LV cables, core drilling.

What's new?

Port of Felixstowe. Installation of 11kv cable, 10,000mtrs 3yr project in conjunction with Winder Power. http://t.co/lpllrt1NWV

Posted on Jul 13, 2015  •  Twitter

Cable installation at Firth Rixon for Cube Electrical services, http://t.co/DTlA1PtXGK

Posted on Nov 26, 2014  •  Twitter

We are currently installing new power cables to Advertising boards around the pitch at Etihad Stadium, Manchester http://t.co/cKhPEqo23K

Posted on Jul 10, 2014  •  Twitter

We have joined forces with IUS & are installing over 10km of Power control cable at Thames water Beckton site, London http://t.co/nm5r4KrQ3F

Posted on Jun 26, 2014  •  Twitter

Installing multiple cable runs at Fife NGL Plant in decent weather and have been all week. #cablepullers http://t.co/0tcfAGKBXf

Posted on Oct 11, 2013  •  Twitter

High Level Cable Installed at Rugeley Power Station, part of the National Power Grid @nationalgriduk

Posted on Sep 13, 2013  •  Twitter

September Highlights - Cables installed at Fishermans Friend, Fleetwood. http://t.co/2NuNnQDcLT

Posted on Sep 13, 2013  •  Twitter

Jongo S3 Wireless Speaker | Pure http://t.co/AiRlejq2bn

Posted on May 27, 2013  •  Twitter

Installing 3 core 95mm cables at @Etihad_Stadium today. http://t.co/b3FS7EkFjH

Posted on May 21, 2013  •  Twitter

Similar Businesses

D F Plumbing
Barnsley (3.4 mi)
Easy Flow Drain
Dewsbury (4.2 mi)
J J Construction
Brighouse (4.8 mi)
Alternative Drainage Wakefield
Wakefield (5.3 mi)
(4)
Bentley Drains
Bradford (6.4 mi)
(3)
Perfect Pressure
Wakefield (6.4 mi)